en-us_products:mpino_studio2:first_project

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
en-us_products:mpino_studio2:first_project [2026/10/03 13:15] – external edit 127.0.0.1en-us_products:mpino_studio2:first_project [2026/11/13 00:27] (current) – external edit 127.0.0.1
Line 86: Line 86:
 | ''F8'' | RESET coil | Releases an output held by SET. | | ''F8'' | RESET coil | Releases an output held by SET. |
 | ''F9'' | Output coil | Applies the condition's ON/OFF state on every scan. | | ''F9'' | Output coil | Applies the condition's ON/OFF state on every scan. |
 +| ''F10'' | NOT contact | Inverts the condition calculated before it. |
 | ''F11'' | Rising edge | Turns ON for one scan when the state changes from OFF to ON. | | ''F11'' | Rising edge | Turns ON for one scan when the state changes from OFF to ON. |
 | ''F12'' | Falling edge | Turns ON for one scan when the state changes from ON to OFF. | | ''F12'' | Falling edge | Turns ON for one scan when the state changes from ON to OFF. |
-| ''Ctrl+Enter'' | Box function | Places a box function such as a timer or counter. |+| ''\'' | Box function | Places a box function such as a timer or counter. | 
 + 
 +''Ctrl+Enter'' opens and closes the Symbols window.
  
 This tutorial uses only ''F2'' and ''F9''. The completed circuit turns P32 ON while P0 is ON. This tutorial uses only ''F2'' and ''F9''. The completed circuit turns P32 ON while P0 is ON.
Line 134: Line 137:
  
 The port list refreshes automatically when the drop-down opens. You can cancel an upload from the bottom panel while it is running. The port list refreshes automatically when the drop-down opens. You can cancel an upload from the bottom panel while it is running.
 +
 +While uploading, the bottom panel shows the current stage and a progress bar at the right end of its tab row. The stage changes through labels such as **Converting (1/3)**, **Compiling (2/3)**, **Connecting to board (3/3)**, and **Writing to board (3/3)**, and the progress percentage also appears while the program is written to the board. When the upload finishes, **Done** appears. If you turn on **Verify after upload** under **File → Preferences → General**, a **Verifying (3/3)** stage follows the write.
  
 ===== 9. Verify Operation ===== ===== 9. Verify Operation =====
en-us_products/mpino_studio2/first_project.1791000954.txt.gz · Last modified: by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki